Skip to content

Commercial line

Published:

IKEA Distribution Center, Jarosty – Poland

Expansion of the IKEA logistics center, which has become one of the largest in the world, which is responsible for the supply of furniture and home furnishings to 27 IKEA locations in 10 European countries: Poland, the Czech Republic, Slovakia, Lithuania, Latvia, Romania, Bulgaria, Serbia, Croatia and Hungary.
We were the only ones who met the very high IKEA requirements for air handling units. Each element of the installation has very strict technical requirements which are described in a technical card prepared especially for this purpose. As only on the market we have met the parameters like:

  • The SFP-value shall be a maximum of 2,5 kW/(m3/s) at external pressure drops of 300 Pa for supply
  • Sound levels from the unit including air inlet and outlet cowls to the surroundings shall be at a maximum of 40 dB(A) at 10 m distance.
  • Sound levels from the unit to the DUCT system shall be at a maximum of 60 dB(A).
  • And more…

Realization: 2019/2020

Equipment:
1 pcs of DUPLEX 9000 Multi
1 pc of DUPLEX 800 Multi
1 pc of DUPLEX 500 Multi

IKEA Distribution Center,  Jarosty – Poland #1
IKEA Distribution Center,  Jarosty – Poland #2

Cookies consent

For the best experience of using our website, we need your consent to the processing of cookies. These are small files that are temporarily stored in your browser. Thank you for giving it to us and helping us to further improve the website.