Heat recovery ventilation system for Wyndham Law Courts, Melbourne – Australia

Case study
Heat recovery ventilation system for Wyndham Law Courts, Melbourne – Australia

Melbourne, Australia

A unique court complex – one of Australia's largest!

  • Heating
  • Cooling
  • Ventilation
  • Year of Realization 2023

Background

Court Services Victoria, state government body

Court Services Victoria is a state government body providing administrative services for Victoria's courts and tribunals. With 2023 revenue of $800m and 2,795 employees, the organization delivered the new $300m Wyndham Law Courts - the largest court complex outside Melbourne's CBD. This state-of-the-art facility brings together the Magistrates' Court, Children's Court and Victorian Civil and Administrative Tribunal, featuring 13 courtrooms, four hearing rooms, three mediation suites and 26 holding cells.

Court Services Victoria, state government body

Customer´s requirements

The challenge

The brief from the client for the mechanical system was to provide a sustainable design, considering energy efficiency, indoor environmental quality, occupant comfort, functionality, serviceability and maintainability.

The project timeline required the heat recovery ventilation system to be delivered and positioned in place prior to the roof and walls being completed at the new building. This required meticulous planning to avoid any delays, ensuring that all 30 air handling units were successfully lifted and positioned within a two-week timeframe.

The challenge

Our solution

High-efficient air handling units DUPLEX Multi – 30 pcs

We supplied AMEC Technologies, our distributor in Australia, with 30 DUPLEX Multi units with flow rates from 5000 up to 10 000 m3/hr delivered to site with integrated access control system, providing a complete turnkey solution for the mechanical contractor and builder.

The solution offered multiple advantages: compact dimensions of AHUs with integrated heating and cooling coils and high variability of spigot connections significantly simplified installation and reduced space requirements for the building's technical facilities, Plug´n´Play control system then offered quality control and testing performed in the factory to reduce risk of issues during installation, no requirement for field fitting of controls to the AHUs reducing onsite labour and H&S risks, and significantly reducing time and trades for faster project timelines.


High-efficient air handling units DUPLEX Multi – 30 pcs

The Results

Key benefits of ATREA heat recovery AHU / air handling units

Wyndham Law Courts now have ErP 2018 compliant heat recovery air handling units, enhancing design and improving indoor air quality within the spaces. The high-efficiency counterflow heat exchangers enabled the mechanical contractor to reduce the overall primary plant load, resulting in significant capital cost savings during the design phase.

Key parameters:

  • ErP 2018 compliant heat recovery ventilation units,
  • integrated control system,
  • factory quality control and testing,
  • reduced onsite installation time and labour requirements,
  • significant energy consumption savings through high-efficiency operation.


Key benefits of ATREA heat recovery AHU / air handling units

Client benefits

Thanks to comprehensive factory testing and integrated control systems, the mechanical works contractor achieved faster installation times and reduced health and safety risks on site.

The highly efficient AHUs deliver sustained energy savings, which are reflected in a fast return on investment.

AMEC ensured that the strict tender budgets were adhered to in order to deliver this project successfully.

Get more details - contact us

Feedback from the customer

"The ATREA heat recovery system exceeded our expectations. Factory-tested units with integrated controls significantly reduced installation time and eliminated commissioning issues in the field. The energy efficiency of the heat recovery systems delivered the sustainability results required for this important public infrastructure project."

Sean Gibbons – director AMEC Technologies

Installed products

Contact us

Let's create your ideal environment

Our team of experts is dedicated to designing and delivering systems tailored to your unique needs, ensuring optimal performance and efficiency in every space.

Schedule a consultation

Cookies consent

For the best experience of using our website, we need your consent to the processing of cookies. These are small files that are temporarily stored in your browser. Thank you for giving it to us and helping us to further improve the website.
More information can be found in our Privacy Policy.